Apart from custom kitchens we also offer a wide range of services at every step of your kitchen renovation. Whether you're looking for a complete solution or just custom cabinets, you can choose the option that best suits your needs. 

Our service range includes everything from kitchen design and planning to full project management. 

To-do list 

I would suggest to always do your research before hiring a contractor. 

  • Check Houzz for design ideas.

  • Read about different materials and finishes.

  • Establish goals, budgets, and deadlines.

  • Check reviews and references. 

What Are the Steps in a Kitchen Renovation?

1 - Design stage

This is the most exciting step in the whole process for the customers.

When you just starting your research, check Houzz for design ideas - there are plenty. Check our ideabooks. Make sure you have the time and budget needed to get the work done.

2 - Set a Budget

Come up with a number on how much you want to spend on the renovation. Consider budgeting an extra 10 to 20 percent for unexpected costs that might arise. 

3 - Hire a Contractor

Research and select a contractor  you feel comfortable with . Be sure to sign contracts that help define the scope of work and the process to potentially avoid or resolve any problems

4 - Obtain Permits 

Depending on the work you are planning to do it might be required to get a  building permit  or management approval when renovating  a condo.  

5 - Demolition

Regardless of how big your kitchen upgrade is, there will be demolition involved. Typical demolition will involve removing old countertops,cabinets, and tiles. Depending on the project, walls, popcorn ceiling, bulkhead, or drop ceiling might be removed next.   

6 - Work Behind the Walls

Now, it is the time for work behind walls, under floors, and above ceilings — mainly electrical and plumbing. Add wires for new outlets, switches, appliances, and relocating plumbing pipes if needed.  Next, patch, hang drywall, tape and sand for smooth exterior surfaces.

6 - Drywall 

This dusty stage might take a wile. We will install drywall, tape and sand for smooth exterior finish. After or during that stage we could also fix the existing sub-floor or install new one. 

7 - Painting

Its always better to prime and paint before doing the floor because is very easy to damage and very hard to fix. 

8 - Install Flooring

When all the dirty work is done, its time to do the flooring. The most preferred type  is hardwood or tiles as they last longer and give the kitchen designer look.

9 - Install Cabinets

Now when walls and floors are done, cabinets are typically installed next, with upper cabinets going in before lower ones. This step the major part of the kitchen renovation and take the most of the money out of the budget for entire project.

After cabinets are installed, we can do a template for a countertop, fabricate it, and than install. Its usually takes 3-5 days as countertops have to be custom made and cut for your cabinetry and sink space. 

11 - Appliances

While your countertops is being fabricated, its a good time to bring in and install appliances. 

12 - Plumbing Works

Our  licensed   plumber will connect your sink, dishwasher, fridge, and other appliances that require a water line.  

13 - Backsplash

Tile or quartz backslash can be installed  before or after plumbing, depending on the project, but it doesn't take much time do it. If it is quartz, then it will be templated after the countertop installation and fabrication will take a few days (during which appliances will be installed and plumbing works done) 

14 - Lighting

Our electrician will install new light fixtures, outlets, sockets, and undercabinet lights. Everything is almost done.

15 - Finishing Touches

After final painting, hardware installation,other touch-ups, and clean-up, you will be able to move in into your new place! Very exiting moment :)

to be updated

Are you ready to renovate your space? Call us now.

Contact us

647.953.5316

55 Bloor Street East Toronto, ON M4W 1A9

240 Birmingham St Etobicoke, ON M8V 2C8

©2015 by Devix Kitchens

55 Bloor Street East Toronto, Ontario M4W 1A9

647.953.5316